IMU with IMS 5 Processing subsystem
IMU with IMS 5 Processing subsystem
A workpiece carrier is located on the Mechatronic Unit, loaded with a completely assembled, two-part workpiece (upper and lower part). The loaded workpiece carrier is positioned in the machining device. The workpiece is fixed for machining. A bolt is pressed into the holes of the workpiece from the drop magazine. The loaded workpiece carrier moves to the end of the belt to be taken over by the next unit.