IMS 16 Painting subsystem
IMS 16 Painting subsystem
There is a workpiece carrier with a completely assembled car on the conveyor belt. The workpiece carrier is positioned in the painting station. The gates to the painting station are closed. During the painting process the suction system must be activated. The painting process starts and this is displayed by LED strips. After the painting process has been completed the gates are opened and the workpiece carrier loaded with the painted car proceeds to the end of the conveyor belt where it is to be taken by the next subsystem.
Training content:
- Basic notes on conducting experiments
- Detailed experiment description
- Basic information on the sequence control system
- Programming the sequence control system
- Programming a micro-controller
- Triggering the LED strips via the micro-controller