EEM 5.2-3 Power grid synchronisation 300W
EEM 5.2-3 Power grid synchronisation 300W
In mains synchronization, the unloaded generator is connected to the mains power grid. Voltage, frequency and phase-angle have to coincide with the corresponding variable on the mains power grid. To measure these variables, a variety of different measuring instruments are used. The variables are set by means of the generator speed and generator excitation.
Training contents:
- Manual mains synchronization is performed using the bright method, dark method and three-lamp synchronization circuits
- Mains synchronization using the two-range frequency meter, two-range voltmeter, Synchronoscope and zero-voltage meter
- Influence of generator speed
- Influence of generator excitation
- Adjusting energy flow by means of the drive