Laboratory power distribution unit, (16 student workstations, 1 teacher workstation, 2x USV, inspection socket)
Power distribution unit designed especially for labs equipped with SybaNet lab control for installation inside a floor cabinet.
After installation in the appropriate floor cabinet, all operating elements (key switch, emergency-off button, phase control lights and FCCB switch) are located at the top in a freely accessible operating unit. All other integrated elements like automatic circuit-breakers offering safety protection of desk groups and the IT power supply, inspection socket etc. are located behind a lockable door.
The individual elements of the power supply are:
- 1 switch disconnector 63A incl. auxiliary switch
- 1 primary contactor for central voltage enabling
- 1 emergency-off mushroom-head pushbutton with latch
- Emergency stop cut-off via isolating element conforming to DIN VDE 0100-530 2011-06 / VDE 0100-723
- 1 key switch as central on/off switch
- 1 control fuse 6A for the control circuit
- 2 earthing-pin sockets (inspection socket), 16A, uninterruptable (no-break) supply
- 3 phase conductor control lights L1, L2, L3
- 17 miniature circuit-breakers, 3-pole, 16A
- 2 miniature circuit-breakers, 1-pole, 16A, uninterruptable (no-break) for IT power supply
- Terminal strip for connection of desk groups (max. 16 + teacher's desk)
- Supply without floor cabinet (ST8007-3X or -3Y also required)
- This distributor has been subjected to technical certification and is approved